For EV owners, having convenient public charging is key to making a battery powered vehicle an everyday driver. Public chargers are found at workplaces, multi-unit dwellings (MUD’s), airports, retail locations and more. However, EV charging station installation costs can be expensive. These up-front costs can vary significantly by project type and region, and include infrastructure and civil construction fees. Then there are the recurring operating costs of network service fees, data coverage and overhead expenses. These can add up and may significantly impact the profitability of a charging station project.

For example, many charging developers report that negotiating use agreements with property owners is the biggest source of upfront and ongoing operational costs for their projects. Some of these fees can be negotiated or eliminated by partnering with an EV charge network. In addition, the upfront cost of civil construction can be significant, ranging from 15 to 30 percent of the overall up-front costs. This can increase as the size and complexity of a project increases.

The location of EV chargers is another important factor that influences up-front and recurring costs. Ideally, EV chargers are located close to existing electrical services that can be easily connected to the power grid. This will minimize installation costs. In some cases, the location of a new EV charging station will require a civil construction project to extend the existing power infrastructure to the EV charger site.

A wide range of EV chargers is available, including 240-volt Level 2 units that can take up to eight hours to fully replenish a vehicle battery, and level 3 fast DCFCs that can charge a car to 75 percent in about a half hour. The type and size of a given charging unit will depend on the expected usage pattern for that particular location.

To support equitable access to EV charging, all EV chargers should be designed with accessibility features in mind. This includes a clear floor or ground space and operable parts that are within reach range for people with disabilities, as well as sufficient clearance in front of the charger to allow mobility device users to approach and operate it. Bollards should not obstruct these areas.

EV chargers should also be provided with shelters to protect them from the elements, such as rain, snow/ice and extreme sun/heat. These elements can interfere with charging and make it difficult to access the station by people who use mobility devices. A shade canopy with a movable roof provides protection while allowing the charger to be used by people who use mobility devices.

The Make-Ready program offers a variety of incentives to help public, private and not-for-profit organizations install EV charging stations at workplaces, multi-unit dwellings, MUD’s and other eligible facilities. To get started, contractors can complete an application in the Program Portal and SDG&E will review it and determine if the project is eligible for incentives.

Tags:level 3 floor-standing ev charger | level 2 ev charger | type 2 wall-mounted ev charger